Fire Sprinkler Installation-Cooper Building
Bid Number:
2018-116
Start / End Dates & Times:
08/04/2017 - 12:00pm to 08/17/2017 - 11:00am
Bid: Closed
Addendum(s):
Bid opens on Thursday, Aug. 17th at 11 am.
This bid requires a 5% bid bond. If the bid bond is not submitted with the bid, the bid will automatically be rejected.